Clinton River Corridor
Cost: $4.5 Million
Fiduciary: City of Utica & City of Sterling Heights
Date Completed: Spring 2019
25 log jams containing approximately 385,000 cubic feet of debris were removed
24 log vanes installed as streambank protection and habitat
Stabilized 7,600 feet of eroding riverbanks
The 9-mile stretch of the Clinton River through Sterling Heights and Utica is now navigable for the first time since the 1970s
Photo Credit: HRC